Due to a shift in policy, from 0900 GMT on Wednesday 14th July 2021, we will be disabling ssh access to the server for external users. External users who wish to continue to access code repositories on the server will need to switch to using https. This can be accomplished in the following way: 1) On the repo on gitlab, use the clone dialogue and select ‘Clone with HTTPS’ to get the address of the repo; 2) From within the checkout of your repo run: $ git remote set-url origin HTTPS_ADDRESS. Here, replace HTTPS_ADDRESS with the address you have just copied from GitLab. Pulls and pushes will now require you to enter a username and password rather than using a ssh key. If you would prefer not to enter a password each time, you might consider caching your login credentials.

  1. 14 Feb, 2013 2 commits
    • Pierre Cazenave's avatar
      This adds a new variable to the forcing output file (longwave surface flux)... · b95c98c1
      Pierre Cazenave authored
      This adds a new variable to the forcing output file (longwave surface flux) and allows the input struct to contain a new field (nshf) which is the pre-computed net surface heat flux. This approach means the flux is not calculated in here but is instead dump from the nshf variable. If this variable is not in the input struct, the old way still works. The calculation of the net surface heat flux is also fixed (the sign of the flux was the wrong way around before) based on the NCEP operational FORTRAN scripts
      b95c98c1
    • Pierre Cazenave's avatar
      Add support for the native OPeNDAP capabilities in the netcdf tools in newer... · e2552248
      Pierre Cazenave authored
      Add support for the native OPeNDAP capabilities in the netcdf tools in newer version of MATLAB. Also fix some of the issues with regards the precipitation and evaporation variables (notably setting the evaporation to P_E instead of subtracting it from the precipitation rate and setting it to P_E).
      e2552248
  2. 13 Feb, 2013 1 commit
  3. 12 Feb, 2013 5 commits
  4. 11 Feb, 2013 4 commits
  5. 08 Feb, 2013 14 commits
  6. 07 Feb, 2013 3 commits
  7. 05 Feb, 2013 2 commits
  8. 04 Feb, 2013 9 commits